Kentec safeguards tube

The recent opening of the Northern Ticket Hall at King’s Cross St. Pancras Underground Station – the latest phase of a £800M redevelopment – includes 10 new escalators, installed to provide access to the Victoria and Piccadilly Tube lines from the ticket hall.

The installation of a fully developed Escalator Water Suppression System (EWSS), a bespoke system from Kentec Electronics Ltd, incorporates the latest developments in linear detection cable. The system is designed to give a greater degree of control over the sprinkler system as it allows sprinkler activation to be more localised, whilst providing a fire safe environment and minimising service disruption from false alarms.

In this latest version of the King’s Cross EWSS, Kentec has played a principal role in integrating the Listec linear heat detection interface to an addressable control system for ease of configurability.

The control system has been used extensively in London Underground stations including Moorgate, Bank, Embankment, Holborn, Bond Street, St Pauls and Shepherds Bush.

You might also like
where to buy viagra buy generic 100mg viagra online
buy amoxicillin online can you buy amoxicillin over the counter
buy ivermectin online buy ivermectin for humans
viagra before and after photos how long does viagra last
buy viagra online where can i buy viagra